Free planShowing the last 30 days. Full history, watchlists and alerts are on the paid plans.Pricing
Companies

GE Vernova Operations LLC

Unverifiedgrant

Capital Timeline

Capital this company has received, each line traceable to a primary record. Amounts are obligations, not contract ceilings.

Total
$2.8M
Jul 17, 2026 – Aug 6, 2026
Government
$2.8M
3 awards
Government, last 13 weeks
$2.8M
none in prior period
How far the money has moved
Announced
not ingested
Committed
$2.8M
Awarded
not ingested
Disbursed
$4.6M
cumulative
Deployed
not ingested
Recognized
not ingested

A blank stage means the data is not ingested yet, not that the money stopped there.

Across the lifetime of these contracts, $7.5M has been obligated and $4.6M paid out. $2.9M has not been disbursed.

Cumulative from contract start through 2026-08-17. The total above covers only the transactions ingested in the tracking window — a different measure.

Funders
  • Dept. of Energy$2.8M3
Award history
2026-08-06$0Grant DEAR0001420Dept. of EnergyARPA-E / High-risk EnergyC
2026-08-05$0Grant DEAR0001848Dept. of EnergyARPA-E / High-risk EnergyC
2026-07-17$2.8MGrant DEAR0002032Dept. of EnergyARPA-E / High-risk EnergyC
Others drawing capital in ARPA-E / High-risk Energy

Aggregated from the largest awards in this theme; companies built on many small awards will not appear here.

Why It Matters

Not enough signal yet to assess this company's relevance to Japanese firms.

Events

Events used as evidence for Stage / LCI. Facts and interpretation are recorded separately.

grantAI Extracted2026-08-06

GE VERNOVA OPERATIONS LLC — Grant DEAR0001420

GE VERNOVA OPERATIONS LLC. MOD 012: NCE AND PD CHANGE. PROJECT TITLE: ULTIMATE REFRACTORY ALLOY INNOVATIONS FOR SUPERIOR EFFICIENCY (RAISE) CONTROL NUMBER 2337-1501 THIS COOPERATIVE AGREEMENT IS AWARDED TO GE VERNOVA OPERATIONS FOR A PROJECT ENTITLED ''ULTIMATE REFRACTORY ALLOY INNOVATIONS FOR SUPERIOR EFFICIENCY (RAISE)''. THIS AWARD IS BEING MADE IN ACCORDANCE WITH FOA NUMBER DE-FOA-0002337, ULTRAHIGH TEMPERATURE IMPERVIOUS MATERIALS ADVANCING TURBINE EFFICIENCY (ULTIMATE) AND CONTROL NUMBER 2337-1501. MOD 0001: REVISE ATTACHMENT 2 MOD 002: REASSIGN THE PROGRAM DIRECTOR MOD 003: NO COST EXTENSION MOD 004: NO COST EXTENSION MOD 005: SUPPLEMENTAL FUNDING MOD 006: NO COST EXTENSION MOD 007: NO COST EXTENSION MOD 008: RENEWAL MODIFICATION MOD 009: NAME CHANGE MOD 010: PD CHANGE MOD 011: ADMIN POC CHANGE MOD 012: NCE AND PD CHANGE

grantAI Extracted2026-08-05

GE VERNOVA OPERATIONS LLC — Grant DEAR0001848

GENERAL ELECTRIC COMPANY, GE RESEARCH, 3047-1503, DE-FOA-0003047, (GOPHURRS) MOD 0006 - PI CHANGE PROJECT TITLE, SPEEDWORM: SWIFT, PORTABLE AND EFFICIENT ELECTRICAL UNDERGROUNDING USING A WATERFREE, COMPACT AND RELIABLE MACHINE SPEEDWORM WILL LEVERAGE AND EXTEND WORLD-CLASS CAPABILITIES TO PROVIDE AN INNOVATIVE SOLUTION TO THE GOPHURRS PROBLEM. GE’S WORM TUNNELING TECHNOLOGY, DEVELOPED UNDER A DOD INVESTMENT FROM DARPA (UNDERMINER) AND THE OFFICE OF NAVAL RESEARCH (ONR) (BOREWORM)—INSPIRED BY EARTHWORMS AND TREE ROOTS—HAS THE CAPABILITY TO CREATE TUNNELS IN ARANGE OF SOIL CONDITIONS USING COMPACTION INSTEAD OF FLUID INJECTION AND SPOIL REMOVAL. THE SYSTEM CAN ANCHOR ITSELF AND TOW-SIGNIFICANT PAYLOADS (SUCH AS CONDUIT OR CABLE). THIS CAPABILITY, COUPLED WITH CSM’S GEOTECHNICAL EXPERTISE, AND DECADES OF UNDERGROUNDING EXPERIENCE FROM QSM AND NATIONAL GRID, PROVIDES A FOUNDATION FOR TRUE TRANSFORMATION IN ELECTRICAL UNDERGROUNDING. MOD 0001: SOPO & NAME CORRECTION MOD 0002: PI CHANGE

Timeline

No timeline articles for this company yet.