Lockheed Martin Integrated Systems, LLC
Capital Timeline
Capital this company has received, each line traceable to a primary record. Amounts are obligations, not contract ceilings.
A blank stage means the data is not ingested yet, not that the money stopped there.
Across the lifetime of these contracts, $363.2M has been obligated and $153.7M paid out. $209.5M has not been disbursed.
Cumulative from contract start through 2026-08-17. The total above covers only the transactions ingested in the tracking window — a different measure.
- NASA$3.0M2
- Blue Origin Manufacturing, LLC$250.0M
- The Boeing Company$244.0M
- Lockheed Martin Corporation$133.1M
- Northrop Grumman Systems Corporation$123.4M
- Axiom Space Inc$92.5M
- BAE Systems Space & Mission Systems Inc.$66.7M
Aggregated from the largest awards in this theme; companies built on many small awards will not appear here.
Why It Matters
Not enough signal yet to assess this company's relevance to Japanese firms.
Events
Events used as evidence for Stage / LCI. Facts and interpretation are recorded separately.
LOCKHEED MARTIN INTEGRATED SYSTEMS, LLC — Contract NNG11FC20C
EXECUTIVE ORDER (E.O.) 14398 TITLED "ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS. THE MOSES II EFFORT IS A SOLE-SOURCE FOLLOW-ON CONTRACT TO MAINTAIN THE HEALTH AND SAFETY OF THE HST OBSERVATORY THROUGH THE NEXT PHASE OF ITS SCIENCE MISSION. THE SCOPE OF THIS FOLLOW-ON EFFORT INCLUDES CONDUCTING ALL ELEMENTS OF HST OPERATIONS OTHER THAN SCIENCE OPERATIONS, AND TO PERFORM SYSTEMS ENGINEERING TASKS REQUIRED TO PROPERLY MAINTAIN HST FLIGHT AND GROUND SYSTEMS.MISSION OPERATIONS RESPONSIBILITIES INCLUDE SAFE AND EFFICIENT CONTROL AND UTILIZATION OF THE HST OBSERVATORY, MAINTENANCE AND OPERATION OF HST-UNIQUE FACILITIES AND EQUIPMENT, AS WELL AS CREATION, MAINTENANCE, AND UTILIZATION OF HST OPERATIONS PROCESSES AND PROCEDURES. CRITICAL SYSTEMS ENGINEERING RESPONSIBILITIES CONSIST OF OPTIMIZING MISSION SYSTEM CAPABILITIES TO MAXIMIZE HST OPERATIONS EFFECTIVENESS AND SCIENCE PRODUCTIVITY. ESSENTIAL MANAGEMENT REQUIREMENTS INCLUDE PROVIDING A TECHNICAL STAFF POSSESSING IN-DEPTH KNOW
Timeline
No timeline articles for this company yet.