Texas A&M Engineering Experiment Station
Capital Timeline
Capital this company has received, each line traceable to a primary record. Amounts are obligations, not contract ceilings.
A blank stage means the data is not ingested yet, not that the money stopped there.
Across the lifetime of these contracts, $4.1M has been obligated and $1.9M paid out. $2.2M has not been disbursed.
Cumulative from contract start through 2026-08-17. The total above covers only the transactions ingested in the tracking window — a different measure.
- Dept. of Energy$7.6M12
- The Texas A&M University Systemparent$0
- Texas A&M Engineering Experiment Stationthis company$7.6M
- Texas a & M University$5.4M
Group total $13.0M. The total above covers this legal entity only. Awards are recorded per entity, so which figure to read depends on the question — the entity if you are dealing with it, the group if you are tracking where capital lands.
- Lithios Inc$20.0M
- Precision Combustion, Inc.$4.9M
- Phasecraft Inc.$4.5M
- And Battery Aero Inc.$3.7M
- Roca Water, Inc.$3.7M
- Saint-Gobain Ceramics & Plastics, Inc.$3.7M
Aggregated from the largest awards in this theme; companies built on many small awards will not appear here.
Why It Matters
Not enough signal yet to assess this company's relevance to Japanese firms.
Events
Events used as evidence for Stage / LCI. Facts and interpretation are recorded separately.
TEXAS A&M ENGINEERING EXPERIMENT STATION — Grant DEAR0001988
TEXAS A&M ENGINEERING EXPERIMENT STATION: AMENDMENT 0003: PD CHANGE FOA NUMBER: DE-FOA-0003240 (CHADWICK) CONTROL NUMBER: 3240-1512 PROJECT TITLE: ''BATCH-WISE IMPROVEMENT IN REDUCED DESIGN SPACE USING A HOLISTIC OPTIMIZATION TECHNIQUE FOR FUSION ENVIRONMENTS (BIRDSHOT-FUSE)'' TEXAS A&M PROPOSES TO IDENTIFY SUITABLE FIRST-WALL MATERIALS REPRESENTS A HIGHLY CONSTRAINED, MULTI-OBJECTIVE MATERIALS SYSTEM DISCOVERY PROBLEM. THE HARSH OPERATING CONDITIONS IN THE FIRST WALL OF FUSION REACTORS PRESENT SIGNIFICANT MATERIAL CHALLENGES. NO EXISTING MATERIAL MEETS ALL CRITICAL PERFORMANCE CRITERIA––E.G., LOW ACTIVATION, HIGH THERMAL CONDUCTIVITY TO WITHSTAND THERMAL SHOCK, RESISTANCE TO IRRADIATION DAMAGE, DUCTILITY AT AMBIENT TEMPERATURE, AND MINIMAL TRITIUM RETENTION. FINDING MATERIALS THAT STRIKE A BALANCE AMONG THESE DEMANDS REQUIRES SUBSTANTIAL TRADE-OFFS. ADDITIONALLY, BECAUSE THESE REQUIREMENTS VARY WITH PROXIMITY TO THE PLASMA, MULTIPLE MATERIALS MUST BE DISCOVERED THAT MEET INDIVIDUAL P
TEXAS A&M ENGINEERING EXPERIMENT STATION — Grant DENE0009628
FISCAL YEAR 2025 CONSOLIDATED INNOVATIVE NUCLEAR RESEARCH AWARD - TEXAS A&M UNIVERSITY
Timeline
No timeline articles for this company yet.