Jul 24, 2026 – Aug 13, 2026
Government
$4.4M
3 awards
Government, last 13 weeks
$4.4M
none in prior period
How far the money has moved
Announced
not ingested
Committed
$4.4M
Awarded
not ingested
Disbursed
not ingested
Deployed
not ingested
Recognized
not ingested

A blank stage means the data is not ingested yet, not that the money stopped there.

Funders
  • Dept. of Energy$4.4M3
Award history
2026-08-13$2.7MGrant DEIE0000203Dept. of EnergyRenewables & EfficiencyC
2026-08-06$0Grant DECR0000086Dept. of EnergyEnergy CybersecurityC
2026-07-24$1.7MGrant DECR0000086Dept. of EnergyEnergy CybersecurityC
Others drawing capital in Renewables & Efficiency

Aggregated from the largest awards in this theme; companies built on many small awards will not appear here.

Why It Matters

Not enough signal yet to assess this company's relevance to Japanese firms.

Events

Events used as evidence for Stage / LCI. Facts and interpretation are recorded separately.

grantAI Extracted2026-08-13

ALASKA VILLAGE ELECTRIC COOPERATIVE INC. — Grant DEIE0000203

ALASKA VILLAGE ELECTRIC COOPERATIVE, INC. (AVEC) ON BEHALF OF AVEC/NUNAVAK ISLAND MEKORYUK ALASKA (NIMA) CORPORATION RENEWABLE ENERGY JOINT VENTURE (JOINT VENTURE) IS PROPOSING AN INTEGRATED ENERGY SYSTEMS PROJECT THAT INCLUDES WIND GENERATION AND BATTERY STORAGE IN MEKORYUK, ALASKA. MEKORYUK IS A CUP’IG VILLAGE WITH OUTSTANDING CLASS 6 WIND ON THE NORTH SHORE OF NUNIVAK ISLAND, 30 MILES OFF THE COAST OF ALASKA IN THE BERING SEA. (SEE MAP IN SITE AND RESOURCE MAPS AND GRAPHICS FILE.) SINCE 2009, AVEC HAS OWNED AND OPERATED TWO WIND TURBINES IN MEKORYUK THAT NOW NEED TO BE REPAIRED. THIS PROJECT WOULD INSTALL REFURBISHED MODEL B TURBINE GENERATORS TO REPOWER THE TWO TURBINES WITH 200 KILOWATTS (KW) OF RELIABLE WIND POWER CAPACITY. TO TAKE FULL ADVANTAGE OF ALL THE WIND POWER GENERATED, THIS PROJECT WOULD ALSO INSTALL A BATTERY ENERGY STORAGE SYSTEM (BESS), WITH A POWER CAPACITY OF 320 KW AND STORAGE CAPACITY OF 540 KWH, AT THE MEKORYUK POWER PLANT. WITH THE PROPOSED IMPROVEMENTS, THE EX

grantAI Extracted2026-08-06

ALASKA VILLAGE ELECTRIC COOPERATIVE INC. — Grant DECR0000086

INFRASTRUCTURE INVESTMENT AND JOBS ACT (IIJA): ALASKA VILLAGE ELECTRIC COOPERATIVE SYSTEM-WIDE CYBERSECURITY IMPROVEMENTS. THIS PROJECT WILL PROVIDE DIRECT SUPPORT TO ELIGIBLE UTILITIES TO MAKE SIGNIFICANT MODIFICATIONS AND INVESTMENTS THAT ENHANCE THE CYBERSECURITY POSTURE OF ELECTRIC UTILITIES.

Timeline

No timeline articles for this company yet.