Capital this company has received, each line traceable to a primary record. Amounts are obligations, not contract ceilings.
A blank stage means the data is not ingested yet, not that the money stopped there.
- Dept. of Energy$-30.0M2
- Alaska Village Electric Cooperative Inc.$2.7M
- County of Carlton$2.0M
- Nevada System of Higher Education$1.6M
- Abb Inc.$1.3M
- Fervo Energy Company$1.0M
- Conovate Inc$800K
Aggregated from the largest awards in this theme; companies built on many small awards will not appear here.
Why It Matters
Not enough signal yet to assess this company's relevance to Japanese firms.
Events
Events used as evidence for Stage / LCI. Facts and interpretation are recorded separately.
GENERAL MOTORS LLC — Grant DEEE0010596
THE PURPOSE OF THE PROJECT IS TO DEVELOP 400-KILOWATT 800 V-CLASS GALIUM-NITRIDE (GAN) ENABLED INTEGRATED ELECTRIC DRIVE SYSTEMS WITH THE TARGET SYSTEM EFFICIENCY OF GREATER THAN 96% AND POWER DENSITY OF GREATER THAN 33 KW/L AT A COST/KILOWATT TARGET OF LESS THAN $6 SUITABLE FOR THE LIGHT AND MEDIUM DUTY VEHICLE CLASS. THE PLANNED ACTIVITIES INCLUDE CONCEPT DESIGN, COST PERFORMANCE ANALYSIS, MOTOR DEVELOPMENT, DESIGN OPTIMIZATION, DEVELOPMENT OF A VERTICAL GAN INVERTER, AND INTEGRATION AND VALIDATION TESTS. EXPECTED DELIVERABLES INCLUDE TEST PLANS & RESULTS, LISTING OF ESTIMATED EQUIPMENT, AND MATERIALS FOR THE FINAL DESIGN OF THE INVERTER.
GENERAL MOTORS LLC — Grant DEEE0011340
HIGH SPEED FUEL CELL STACK MANUFACTURING THE PROJECT OBJECTIVE IS TO DESIGN, BUILD, AND DEPLOY A MANUFACTURING SYSTEM TO PRODUCE 20,000 NEXT GENERATION FUEL STACKS/YEAR. THE MANUFACTURING LINE WILL CONSIST OF ANODE AND CATHODE ELECTRODE PROCESSING, UNITIZED ELECTRODE ASSEMBLY (UEA), STACKING, COMPRESSION, AND BUTTON UP OF THE FUEL CELL STACK.
Timeline