Swift Solar Inc
Capital Timeline
Capital this company has received, each line traceable to a primary record. Amounts are obligations, not contract ceilings.
A blank stage means the data is not ingested yet, not that the money stopped there.
- Dept. of Energy$01
- Alaska Village Electric Cooperative Inc.$2.7M
- County of Carlton$2.0M
- Nevada System of Higher Education$1.6M
- Abb Inc.$1.3M
- Fervo Energy Company$1.0M
- Conovate Inc$800K
Aggregated from the largest awards in this theme; companies built on many small awards will not appear here.
Why It Matters
Not enough signal yet to assess this company's relevance to Japanese firms.
Events
Events used as evidence for Stage / LCI. Facts and interpretation are recorded separately.
SWIFT SOLAR INC — Grant DEEE0011424
1. ACHIEVE 27%-EFFICIENT > 500 CM2 APERTURE AREA TANDEM MINIMODULES AFTER 6 MONTHS OF OUTDOOR TESTING IN 3 CLIMATE ZONES MADE BY HIGH-THROUGHPUT-COMPATIBLE (AT LEAST 1 M6 WAFER PER MINUTE) PEROVSKITE VAPOR DEPOSITION. 2. ACHIEVE AT MOST 10% RELATIVE PCE LOSS ON ACCELERATED TESTS THAT UTILIZE CONDITIONS SPECIFIED IN INTERNATIONAL ELECTROTECHNICAL COMMISSION (IEC) 61215 MQT10, 11, 13, AND 21 TESTS ON DAMP HEAT, THERMAL CYCLING, ULTRAVIOLET (UV) EXPOSURE, AND POTENTIAL INDUCED DEGRADATION (PID) FOR AT LEAST 15 MINIMODULES. 3. DEVELOP SCALABLE AND HIGH-THROUGHPUT-COMPATIBLE PASSIVATION THAT CAN ACHIEVE >29% TANDEM SOLAR CELLS ON >160CM2 APERTURE AREAS 4. DEVELOP A FINITE ELEMENT MODEL FOR THE MECHANICAL PROPERTIES OF COMPLETE MINIMODULES INCLUDING CELL STACK, INTERCONNECTS, AND ENCAPSULATION THAT CAN IDENTIFY STRESS CONCENTRATIONS AND PREDICT FAILURE POINTS. 5. SEND MODULES FOR OUTDOOR TESTING AT PACT THAT HAVE < 3% RELATIVE LOSS OVER 6 MONTHS.
Timeline
No timeline articles for this company yet.